20.10.2022
Powerline Multitel for Czech Republic
A team from the recently appointed Multitel Pagliero distributor for the Czech Republic and Slovakia - Inreka Plošiny Servis, has collected a new 22.6 metre MJ226 truck mounted lift on a Mercedes-Benz Atego 4x4 chassis, specially developed for work on the construction of high-voltage power lines.
Please register to see all images
The handover
The vehicle is designed to cope with rough terrain and features a four section boom topped by a long telescopic jib for an outreach of 12.4 metres with 80kg or 9.4 metres with the maximum platform capacity of 250kg.
This unit follows on from a 37.5 metre MJ375 customised lift supplied to Prague Airport. Inreka has also completed the construction of a new headquarters building with larger and more modern workshops and offices.
Please register to see all images
The hand over (L-R) Vit Dolezalek and Peter Matejik of Inreka with Lorenzo Godano of Multitel Pagliero
Managing director Jiří Strnad said: “The cooperation with Multitel Pagliero allows us to have a complete portfolio of work platforms. We are now able to provide our customers with solutions with double telescopic booms or baskets with a load capacity of 300kg. The support of one of Europe’s largest manufacturers of truck-mounted aerial platforms opens a new chapter in our history.”
Uherský Brod is based in Uherský Brod southeast of Brno and north of Bratislava. It specialises in the sale and service of a wide range of vehicle mounted aerial work platforms and has a reputation for providing custom units for specific applications. It was appointed as a Multitel last year.
Comments