In order to view all images, please register and log in. This will also allow you to comment on our stories and have the option to receive our email alerts. Click here to register
20.10.2022

Powerline Multitel for Czech Republic

A team from the recently appointed Multitel Pagliero distributor for the Czech Republic and Slovakia - Inreka Plošiny Servis, has collected a new 22.6 metre MJ226 truck mounted lift on a Mercedes-Benz Atego 4x4 chassis, specially developed for work on the construction of high-voltage power lines.
Please register to see all images

The handover


The vehicle is designed to cope with rough terrain and features a four section boom topped by a long telescopic jib for an outreach of 12.4 metres with 80kg or 9.4 metres with the maximum platform capacity of 250kg.
This unit follows on from a 37.5 metre MJ375 customised lift supplied to Prague Airport. Inreka has also completed the construction of a new headquarters building with larger and more modern workshops and offices.
Please register to see all images

The hand over (L-R) Vit Dolezalek and Peter Matejik of Inreka with Lorenzo Godano of Multitel Pagliero


Managing director Jiří Strnad said: “The cooperation with Multitel Pagliero allows us to have a complete portfolio of work platforms. We are now able to provide our customers with solutions with double telescopic booms or baskets with a load capacity of 300kg. The support of one of Europe’s largest manufacturers of truck-mounted aerial platforms opens a new chapter in our history.”

Uherský Brod is based in Uherský Brod southeast of Brno and north of Bratislava. It specialises in the sale and service of a wide range of vehicle mounted aerial work platforms and has a reputation for providing custom units for specific applications. It was appointed as a Multitel last year.

Comments