15.07.2008
All moved in
While there is still much to do, Spanish aerial lift manufacturer Matilsa has now completed the move into its new 4,500 square metre, €6.5 million production facility .
Please register to see all images
An external view of part of the new Matilsa plant
The new location includes, offices, warehousing and training/meeting rooms in addition to a massive increase in production space.
Please register to see all images
Fabrication to the right assembly to the left
The company says that the additional space gives it the capability to build up to 2,000 units a year of its current trailer lift and self propelled boom models.
Please register to see all images
Assembly Hall one
The self propelled range was recently expanded to include a 65ft platform height articulated boom, the Parma 21D with its usual outrigger option for levelling on slopes. A 53ft model to fill the gap between the new machine and Parma 16 is planned for 2009.
Please register to see all images
Assembly Hall two
Please register to see all images
The new paint facility
Please register to see all images
The design offices
Comments